River Transportation of Equipment for Oil Refinery Production
Route: Volgodonsk (Russia) → Nizhnekamsk (Russia)
Task
- Transport 5 units of refinery equipment as one consolidated river shipment.
- Develop a loading plan considering dimensions (≈21×4.5×4.8 m) and center of gravity.
- Eliminate delays during transshipment and documentation stages.
Solution
- Selection of a river-sea type vessel optimized for draft and deck layout.
- Engineering drawings for sea fastening, coordination and supervision during handling operations.
- Chartering and dispatching along the Volgodonsk → Nizhnekamsk route.
- Control of documentation and port coordination according to schedule.
