Task Deliver a 53-ton, 22-meter ship crane from Italy to the installation site in Russia. Align sea fastening schemes for all legs and eliminate transit idle time.
Solution Factory pickup to a Sicilian port by truck; preparation and packing of OOG parts. Sea leg to Lübeck; onward by liner/feeder service to Saint Petersburg. Engineering drawings for stowage and sea fastening; load distribution control. Stevedoring supervision, forwarding & port coordination, final on-carriage by truck to consignee.
Result No damage or delays; the crane was handed over for installation on schedule. All dimensional, weight and deck load requirements were met.