Objective Organize transportation of two heavy press shipments from Germany to Russia via Baltic ports. Ensure precise load distribution and safety during handling operations.
Solution Chartered a vessel suitable for the cargo dimensions and deck load limits. Developed engineering drawings for stowage and sea fastening both in the hold and on deck. Coordinated operations in Hamburg, Gdynia, and Ust-Luga ports. Supervised loading/unloading under the control of the project engineering bureau.
Result Delivery completed without damage or schedule deviations. The project was recognized by the client as a benchmark for engineering quality and supervision standards.